jobapplier

Associate-Damage Excess

Mahindra Logistics

ParameterDetails

  • DEPS EscalationsRoot cause analysis on every DEPS case. TAT - 48hrs.
  • Identification of DEPSI responsible Employee/BP/Vendor with supporting evidences.
  • CCTV FootagesReview and sharing of CCTV footage & Key highlights with the DEPS HO team shall be completed within the defined TAT of 24 hours.
  • ShortagesMaterial Tracing procedure to be followed and resolve shortages with-in TAT of 48hrs.
  • A) Conduct an initial floor check to verify the material's physical location.
  • B) Collaborate with branches to pinpoint the material's whereabouts within the cluster.
  • C) Coordinate with other clusters to trace the material's movement within the distribution pipeline.
  • D) Analyze the single scan report to facilitate the material's tracing process.
  • E) Scrutinize CCTV footage to identify any potential misrouting scenarios.
  • DamageDamage Ticket Closure Requirements with the TAT of 2hrs :
  • A) All damage tickets within clusters will be closed in accordance with the provided guidelines.
  • B) Each ticket must include clearly visible images.
  • C) All tickets will be closed following the established guidelines.
  • D) Material invoices, along with loss details, must be updated within the damage ticket.
  • E) The remarks column should contain remarks adhering to the provided guidelines.

Interchange & Wrong deliveryResolution with-in TAT : 7Days

  • A) Identify the cross connection of boxes with the help of interchange HO desk.
  • B) Initiate the retrieval of misdirected boxes from consignees and ensure their proper redirection to the correct addresses.
  • C) RCA on Wrong connections.
  • Disciplinary actionsActions: to be taken on at least 10 negligiance towards SOP per month.
  • A) Identify the individual responsible for the DEPS issue with supporting evidence and 1 statment of that indiviuals
  • B) Provide training after taking first statement, with the owner's manager informed, for the first instance of negligence towards the SOP.
  • C) Issue Second Statement for checking repeatation, show-cause letter to the owner.
  • D) Implement a Performance Improvement Plan along with the issuance of a third and final warning letter to the owner for the third instance of negligence, involving their respective HR and manager.
  • E) Termination the owner from their current role upon the fourth instance of negligence.
  • UCG1) Identify the orphan consigment.
  • Performing the RCA with reason.
  • Nos of Consigment recover.
  • Need to maitain the Data of UCG.