jobapplier

Skilled Dry Wall

Innovative Cleaning Services

Skills

Preferred

  • drywall
  • glue / nails / screws
  • keyhole saws
  • lath
  • Scribe and cut edges of tile to fit walls where wall molding is not specified.
  • Cut tile, stone, or other masonry materials.
  • Apply or mount acoustical tile or blocks, strips, or sheets of shock-absorbing materials to ceilings or walls of buildings to reduce reflection of sound or to decorate rooms.
  • Remove worn, damaged or outdated materials from work areas.
  • Felons are encouraged to apply!

Responsibilities

  • Measure and mark surfaces to lay out work, according to blueprints or drawings, using tape measures, straightedges or squares, and marking devices.
  • Measure materials or objects for installation or assembly.
  • Mark reference points on construction materials.
  • Read blueprints or other specifications to determine methods of installation, work procedures, or material or tool requirements.
  • Review blueprints or specifications to determine work requirements.
  • Fit and fasten wallboard or drywall into position on wood or metal frameworks, using glue, nails, or screws.
  • Install building fixtures.
  • Measure and cut openings in panels or tiles for electrical outlets, windows, vents, plumbing, or other fixtures, using keyhole saws or other cutting tools.
  • Measure materials or objects for installation or assembly.
  • Cut openings in existing structures.
  • Hang dry lines to wall moldings to guide positioning of main runners.
  • Mark reference points on construction materials.
  • Hang drywall panels on metal frameworks of walls and ceilings in offices, schools, or other large buildings, using lifts or hoists to adjust panel heights when necessary.
  • Install building fixtures.
  • Operate cranes, hoists, or other moving or lifting equipment.
  • Assemble or install metal framing or decorative trim for windows, doorways, or vents.
  • Install trim or paneling.
  • Coordinate work with drywall finishers who cover the seams between drywall panels.
  • Coordinate construction project activities.
  • Trim rough edges from wallboard to maintain even joints, using knives.
  • Trim excess material from installations.
  • Cut and screw together metal channels to make floor or ceiling frames, according to plans for the location of rooms or hallways.
  • Install metal structural components.
  • Cut metal components for installation.
  • Inspect furrings, mechanical mountings, or masonry surfaces for plumbness and level, using spirit or water levels.
  • Verify alignment of structures or equipment.
  • Cut fixture or border tiles to size, using keyhole saws, and insert them into surrounding frameworks.
  • Install masonry materials.
  • Cut tile, stone, or other masonry materials.
  • Install horizontal and vertical metal or wooden studs to frames so that wallboard can be attached to interior walls.
  • Install metal structural components.
  • Install wooden structural components.
  • Cut metal or wood framing and trim to size, using cutting tools.
  • Cut metal components for installation.
  • Cut wood components for installation.
  • Fasten metal or rockboard lath to the structural framework of walls, ceilings, or partitions of buildings, using nails, screws, staples, or wire-ties.
  • Install metal structural components.
  • Suspend angle iron grids or channel irons from ceilings, using wire.
  • Install building fixtures.
  • Seal joints between ceiling tiles and walls.
  • Apply material to fill gaps in surfaces.
  • Mount tile, using adhesives, or by nailing, screwing, stapling, or wire-tying lath directly to structural frameworks.
  • Install masonry materials.
  • Apply cement to backs of tiles and press tiles into place, aligning them with layout marks or joints of previously laid tile.
  • Install masonry materials.
  • Apply mortar.
  • Nail channels or wood furring strips to surfaces to provide mounting for tile.
  • Install masonry materials.
  • Install blanket insulation between studs and tack plastic moisture barriers over insulation.
  • Install insulation in equipment or structures.
  • Install metal lath where plaster applications will be exposed to weather or water, or for curved or irregular surfaces.
  • Install metal structural components.
  • Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.
  • Clean surfaces in preparation for work activities.
  • Install trim or paneling.

Requirements

  • Remove existing plaster, drywall, or paneling, using crowbars and hammers.
Apply with Jobapplier