Independent Special Inspector - Multiple Disciplines
Energy Resilience Partners, LLC
- Guaynabo, Puerto Rico
- Mid Level
- 1+ years
- Posted
Skills
Required
- NDT
- SI
- ACI
- Concrete
- NDT Level III SI
- Concrete SI
- Construction SI
- NICET Soils II
- GIT
- AWCI EIFS
- Exterior Design Institute
Preferred
- ICC / AWS / NICET
- Rico construction
- structural welding
- weld NDT
- cold-formed steel
- reinforced concrete
- EIFS
FBMG-026 | Fort Buchanan Microgrid | Contingent opportunity
WORK LOCATION: ON ISLAND / PHASE-BASED - continuous or periodic attendance as required by the Statement/Schedule of Special Inspections
About Energy Resilience Partners, LLC
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is developing a contingent project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.
Responsibilities
- Independent Special Inspection Agency; administratively coordinated by CQC Manager
Independent third-party contract assignment; contingent
- Perform IBC Chapter 17 special inspections as an independent third party, separate from the contractor and subcontractor whose work is inspected. Openings may include structural steel/bolting, structural welding, weld NDT, cold-formed steel, reinforced concrete, soils/fill/load-bearing verification, and EIFS.
- Attend applicable preparatory meetings and perform continuous or periodic inspections required by the approved inspection schedule.
- Verify materials, certifications, installation, testing, and workmanship for the discipline in which the inspector is approved.
- Issue daily and biweekly reports, immediately identify discrepancies, and verify corrective work.
- Maintain independence, calibration/qualification evidence, NDT practices where applicable, and complete final-report inputs.
- Coordinate access and reporting with the Special Inspection Agency, CQC Manager, Structural Engineer of Record, and Government.
Requirements
- Steel/bolting: ICC Structural Steel and Bolting Special Inspector plus 1 year related experience, or PE plus 3 years.
- Structural welding: ICC Structural Welding Special Inspector plus 1 year, or AWS Certified Welding Inspector.
- Weld NDT: NDT Level III (SI) or Level II plus 1 year (associate, under required supervision).
- Cold-formed steel: qualifying ICC building/steel credential plus 1 year, or PE plus 3 years.
- Concrete: ICC Reinforced Concrete SI plus 1 year, ACI Concrete Construction SI, or PE plus 3 years.
- Soils/fill: ICC Soils SI plus 1 year, NICET Soils II, GIT plus 3 years, or PE plus 3 years.
- EIFS: AWCI EIFS, Exterior Design Institute, or qualified PE/RA with related experience.
- Ability to work independently on site in Puerto Rico and obtain Government approval/access.
Preferred
- Prior USACE/federal special-inspection reporting and Puerto Rico construction experience.
- Multiple current ICC/ACI/AWS/NICET/NDT credentials and Spanish proficiency.
Field, Travel and Employment Conditions
- This is a contingent opportunity dependent on contract award/NTP, project funding, final staffing authorization, Government acceptance when required, and successful installation-access processing.
- When on site, work may involve tropical heat and humidity, rain, uneven terrain, stairs/ladders, construction noise, required PPE, and extended, weekend, outage, emergency, or alternate-shift hours.
- Candidates must be authorized to work in the United States, follow drug-free workplace and conduct requirements, and protect FCI/CUI using only authorized systems and procedures.
- ERP encourages applications from qualified Native American, Puerto Rican, veteran, military-spouse, disabled, and local candidates. ERP provides equal employment opportunity consistent with applicable law.
REQUISITION
FBMG-026
CSS CAM LCAT
9T or 140 - Technician III / Senior Technical Staff Member (credential dependent)
DUTY LOCATION
Fort Buchanan, Guaynabo, Puerto Rico during inspections
WORK ARRANGEMENT
ON ISLAND / PHASE-BASED - continuous or periodic attendance as required by the Statement/Schedule of Special Inspections
REQUIREMENT BASIS
- SOLICITATION-MANDATED independent third-party inspections
- About ERP and the Project
Application Materials
- Resume showing month/year dates, employer, role, project scope/value, client, and personal responsibilities.
- Copies of required current licenses/certifications with expiration dates.
- Comparable-project list and references where requested, Puerto Rico availability, earliest mobilization date, and requested employment/consulting arrangement.
