Senior Project Manager – Data Center Construction
- $153K – $214K /yr
- Vernon, United States
- Senior Level
- Posted
World Wide Professional Solutions is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
Senior Project Managers to lead large-scale data center construction projects across multiple cities in Texas. This is a high visibility role where you will act as an extension of the owner’s team, leading execution across design, construction, commissioning, and turnover. You will have real ownership, not just coordination responsibility. Project Locations Stamford, TX Haskell, TX Vernon, TX Wichita Falls, TX Wherever you are based, we provide full relocation or travel support including per diem, ensuring a smooth transition so you can hit the ground running from day one.
About Cgc
- Work on complex, high-impact projects in rapidly growing sectors
- Operate in a true owner’s rep capacity with influence and visibility
- Be part of a team focused on execution, not bureaucracy
- Grow alongside major infrastructure and technology expansion across the U.S. Join a company that is scaling and investing in top talent
Responsibilities
- Makes This Role Different Owner’s rep position with direct influence on outcomes Large-scale, mission critical builds with complex infrastructure Fast-paced environment with real decision-making authority
Full lifecycle exposure from design through commissioning
- Highly technical projects involving power, cooling, and redundancy systems
- Lead full lifecycle delivery of data center construction projects from preconstruction through commissioning and turnover
- Act as the primary leader across owners, design teams, contractors, and stakeholders
- Drive schedule, budget, and execution strategy on projects exceeding $500M Oversee site, CSA, MEP, controls, and commissioning scopes
Ensure alignment between design intent and field execution
- Manage critical systems including UPS, switchgear, chillers, CRAH and CRAC units, and distribution infrastructure
- Identify and resolve coordination and constructability challenges proactively Lead commissioning efforts to ensure system performance and reliability
- Enforce safety, quality, and compliance standards including NFPA, NEC, and OSHA Implement lean construction practices to improve efficiency Lead and mentor project teams
Requirements
- You Bring 12 to 20+ years of construction project management experience
- Strong experience with data center or mission critical projects
- Deep understanding of MEP systems and electrical distribution
- Proven ability to lead complex, multidisciplinary teams
- Track record of delivering large-scale projects on time and on budget
- Experience with commissioning, QA/QC, and construction best practices
- Bachelor’s degree in Construction Management, Engineering, or related field PMP, LEED, CxA, or similar certifications are a plus
Preferred
- Proficiency with Procore, Primavera P6, or MS Project Preferred Background Data center experience strongly preferred
- Semiconductor, advanced manufacturing, pharmaceutical, or cleanroom experience is highly relevant
Pay
- The salary range for this full-time role is $153,100.00-$214,366.70 per year.
- Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary.
- This range reflects base salary only, and not the total compensation package.
- World Wide Professional Solutions reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.
Benefits
- Highly competitive compensation aligned with senior-level leadership roles
- Per diem and travel support where applicable Medical, dental, and vision coverage
Life insurance and disability coverage Company-matched retirement plan
- In addition to base salary, WWPS offers a comprehensive benefits package including: Medical Dental Insurance Vision Insurance 401(k) 401(k) Matching Paid Time Off Paid Holidays Short and long-term disability
- Company-Paid Parental Leave State Paid Family and Medical Leave (where applicable)
- Lifestyle Spending Account (LSA) Professional Development & Tuition Assistance #WWPS #LI-PT1
Bottom Line If you are a Senior Project Manager with mission critical experience who wants more ownership, more impact, and better projects, this is one of the strongest opportunities in the data center owners rep construction management space right now. World Wide Professional Solutions (WWPS) is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is WWPS' policy to recruit, hire, train and promote
Team
Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity. All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, WWPS complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
