Senior Construction Scheduler - Houston, TX
S&B Houston
- Texas, United States
- Senior Level
- 12+ years
- Posted
Skills
Required
- EPC / alliance / construction project
- Primavera
- P6
- analytics
- integrated master schedules
- resource planning
- project control processes
- earned value management
- EPC project reporting
- AWP construction installation
- packaging work process
Preferred
- project planning
- integration
- schedule
- risk assessment
- scenario modeling
- resource management
- change control processes
- scheduling standards
Leads scheduling for large, complex EPC projects or alliance programs.
About S&B Houston
- S&B S&B is an exceptional full-service Engineering, Procurement, and Construction (EPC) company, proudly maintaining private ownership and operation for over five decades.
- With our extensive experience, we have successfully undertaken diverse projects across various industries, including Oil & Gas, Chemicals, Petrochemicals, Energy Transition, Power, and Pulp & Paper.
- What sets us apart is our unwavering commitment to safety, timely project completion, and cost-effective solutions.
- Our proven track record speaks for itself, as we consistently deliver outstanding results while adhering to the highest industry standards.
- Moreover, our company culture is unparalleled, fostering an environment of collaboration, innovation, and excellence.
Responsibilities
- Acts as the subject matter expert in project planning, schedule analysis, and integration, providing guidance to the project team and management.
- SUPERVISORY RESPONSIBILITIES Plans, schedules, coordinates and oversees the work of all Project Controls activities at the project level.
- Lead the development and management of the integrated project schedule.
- Facilitate interactive planning sessions Perform advanced schedule analysis, including risk assessment, critical path optimization, and scenario modeling.
- Interface with project management, engineering, procurement, and construction teams to ensure schedule integrity.
- Produce executive-level schedule reports, dashboards, and performance metrics.
- Provide guidance, coaching, and training to schedulers across the project.
- Support project planning, resource management, and change control processes.
- Contribute to company-wide project scheduling standards, processes, and best practices.
Requirements
- Normally requires a four-year technical degree.
- Minimum of 12 years of EPC, alliance or construction project scheduling experience with complex projects.
- Expert-level proficiency in Primavera P6, MS Project, and scheduling analytics tools.
- Strong understanding of integrated master schedules, resource planning, and project control processes.
- Excellent leadership, communication, and stakeholder management skills.
- Experience with schedule risk analysis, earned value management, and large-scale EPC project reporting.
- Expert level proficiency in AWP construction installation packaging work process.
- SKILLS Ability to read and write in the English language.
Benefits
- At S&B, we understand the value of our talented team, and we ensure they are rewarded accordingly.
- We offer a competitive compensation package, flexible and hybrid work schedules, and a comprehensive benefits program to attract and retain the best professionals in the field.
PHYSICAL DEMANDS
May require occasional field trips or assignments to plants. This requires the ability to stand, walk, reach, climb and balance. It also requires clear, close and distance vision, depth perception and the ability to focus.
WORK ENVIRONMENT
Most work is conducted in a professional business setting. Occasional field trips or assignments to the field will require exposure to outdoor weather conditions, loud noise, working near moving mechanical parts, vibration, fumes, toxic or caustic chemicals and airborne particles. #LI-Onsite
