jobapplier

Senior Engineering Technician - Data Center Construction

Schnabel Engineering

Schnabel is seeking a Senior Engineering Technician to join our growing practice to support construction phase work on data center sites across the United States. We are looking for a motivated candidate with attention to detail, a passion to continue to develop as a professional, and a desire to be part of a strong team. This position is a great opportunity for candidates interested in construction of major infrastructure projects and a willingness to re-locate based on project site locations.

About Schnabel Engineering

Schnabel is an employee-owned, professional engineering and consulting firm that focuses on solving problems related to the earth and environment through specialization in geotechnical, geostructural, tunnel, and dam engineering. Schnabel’s high standards for quality, business ethics, and concern for the communities in which we live are a vital part of who we are. Schnabel is an ENR Top 500 Design Firm with 700+ employees in 31 offices throughout the United States.

Are you looking for interesting and meaningful work, a fun and flexible atmosphere, and opportunities to learn, grow, and excel?

If so, then welcome to Schnabel!

We approach problems with creativity and innovation.

Responsibilities

  • Field observation and documentation of construction activities including, but not limited to, earthwork, foundation and retaining wall construction.
  • Review testing performed by others of construction materials including, but not limited to, soil, concrete, grout and reinforcing steel.
  • Preparation of reports documenting observations and test results.
  • Communication with contractors and engineers to discuss observations and test results.

Requirements

  • This position will require travel to project sites, primarily in the eastern or central United States with potential project durations up to 2 years.
  • Minimum 5 years of construction technician experience
  • Interest in working outdoors on construction sites
  • High School degree
  • Possess good oral and written communication skills

Attentive to detail and well-organized

  • Must be able to lift 50 - 75 pounds on an occasional basis and be physically able to negotiate construction sites, climb ladders and work outside
  • Must hold a current, valid driver’s license with an acceptable driving record to operate company or personal vehicles for work-related travel.
  • Ability to pass a background check which may include criminal history, motor vehicle record, and credit check
  • Ability to pass a pre-employment drug screening

Pay

The compensation range for this position is between $30-$45/hour. Compensation for this position may vary based on geographic location and other factors. We remain committed to providing competitive and equitable compensation to all employees, regardless of their location.

Benefits

  • Recognized by CE News as one of the Best Engineering Firms to Work for, Schnabel provides employees with a competitive benefits package including maternity leave, tuition reimbursement for continuing education, health, dental, life and disability insurance and a wellness program. As an employee-owned company, through the Employee Stock Ownership Plan, Schnabel employees directly benefit from the success of our growing firm.
  • Flexible spending accounts
  • Employee life & ADD insurance (100% company-paid)
  • Short-term disability (100% company-paid)
  • Long-term disability
  • 401(k) and profit-sharing plan
  • Employee stock ownership plan (ESOP)
  • 9 Paid Holidays
  • Professional development and tuition reimbursement

This position is eligible for overtime pay at 1.5 times the normal hourly rate, pay for travel and mileage in accordance with GSA and IRS rates and lodging accommodations near project sites.