Process Installation Scheduler
The PAC Group
- Kentucky, United States
- $100K /yr
- Mid Level
- 8+ years
- Posted
Skills
Required
- Primavera
- P6
- earned value
- industrial construction / equipment installation
- Excel
- delay analysis methods
Preferred
- AACE PSP
- PMI-SP certification
- Power BI
- welding
- electrolyte
Build and maintain the integrated installation schedule for all equipment lines in scope. Give the Senior Project Manager a reliable view of progress, critical path and manpower needs. The role sits within a 340–350 person team supervising the installation of calendering, slitting, winding, cell assembly and de-dusting equipment at a giga battery cell plant in the United States.
About The PAC Group
At The PAC Group (PAC), we specialize in engineering consulting, program management, and operational excellence—delivering high-impact solutions in more than 20 countries. We’re proud to partner with the world’s leading companies in automotive, aerospace, industrial, and technology sectors, providing strategic guidance and hands-on execution that drive innovation and efficiency. Whether we’re launching advanced manufacturing systems, deploying digital simulation tools, or scaling global operations, PAC thrives at the intersection of technology, engineering, and problem-solving.
Joining PAC means joining a dynamic, fast-paced, and global team that values curiosity, collaboration, and continuous improvement.
Responsibilities
- Develop the Level 3 and Level 4 installation schedule in Primavera P6, line by line and machine by machine: calenders, slitters, winders, cell assembly stations (tab welding, insertion, can/pouch sealing, electrolyte filling) and de-dusting systems.
- Integrate OEM delivery dates, building and dry room readiness, utilities hook-up and commissioning milestones into one critical path.
- Resource-load the schedule and produce manpower histograms by trade and area to plan mobilization and demobilization of 340–350 people.
- Issue 3-week look-aheads and daily/weekly plans with area supervisors; track percent complete against installation quantities.
- Run schedule updates, critical path and float analysis, delay and impact analysis, and recovery scenarios.
- Support the QS/Controls lead with earned value data (planned vs actual progress) and the time impact of change orders.
- Produce the schedule sections of weekly and monthly client reports.
Requirements
- Degree in engineering, construction management or a related field.
- 8+ years as planner/scheduler on industrial construction or equipment installation projects.
- Expert user of Primavera P6; strong Excel skills.
- Knowledge of earned value and delay analysis methods.
- Fluent English.
Preferred
- Experience scheduling battery, semiconductor, automotive or other high-volume manufacturing plant installations.
- AACE (PSP) or PMI-SP certification.
- Power BI or similar reporting tools.
- OSHA 30 certification.
Pay
- The salary range for this position is dependent upon experience, education, and qualifications.
- The salary range for this position is dependent upon experience, education, and qualifications.
- The salary range for this position is dependent upon experience, education, and qualifications.
- $100,000
- $100,000 USD
Location
Kentucky, United States
