jobapplier

Process Installation Scheduler

The PAC Group

Skills

Required

  • Primavera
  • P6
  • earned value
  • industrial construction / equipment installation
  • Excel
  • delay analysis methods

Preferred

  • AACE PSP
  • PMI-SP certification
  • Power BI
  • welding
  • electrolyte

Build and maintain the integrated installation schedule for all equipment lines in scope. Give the Senior Project Manager a reliable view of progress, critical path and manpower needs. The role sits within a 340–350 person team supervising the installation of calendering, slitting, winding, cell assembly and de-dusting equipment at a giga battery cell plant in the United States.

About The PAC Group

At The PAC Group (PAC), we specialize in engineering consulting, program management, and operational excellence—delivering high-impact solutions in more than 20 countries. We’re proud to partner with the world’s leading companies in automotive, aerospace, industrial, and technology sectors, providing strategic guidance and hands-on execution that drive innovation and efficiency. Whether we’re launching advanced manufacturing systems, deploying digital simulation tools, or scaling global operations, PAC thrives at the intersection of technology, engineering, and problem-solving.

Joining PAC means joining a dynamic, fast-paced, and global team that values curiosity, collaboration, and continuous improvement.

Responsibilities

  • Develop the Level 3 and Level 4 installation schedule in Primavera P6, line by line and machine by machine: calenders, slitters, winders, cell assembly stations (tab welding, insertion, can/pouch sealing, electrolyte filling) and de-dusting systems.
  • Integrate OEM delivery dates, building and dry room readiness, utilities hook-up and commissioning milestones into one critical path.
  • Resource-load the schedule and produce manpower histograms by trade and area to plan mobilization and demobilization of 340–350 people.
  • Issue 3-week look-aheads and daily/weekly plans with area supervisors; track percent complete against installation quantities.
  • Run schedule updates, critical path and float analysis, delay and impact analysis, and recovery scenarios.
  • Support the QS/Controls lead with earned value data (planned vs actual progress) and the time impact of change orders.
  • Produce the schedule sections of weekly and monthly client reports.

Requirements

  • Degree in engineering, construction management or a related field.
  • 8+ years as planner/scheduler on industrial construction or equipment installation projects.
  • Expert user of Primavera P6; strong Excel skills.
  • Knowledge of earned value and delay analysis methods.
  • Fluent English.

Preferred

  • Experience scheduling battery, semiconductor, automotive or other high-volume manufacturing plant installations.
  • AACE (PSP) or PMI-SP certification.
  • Power BI or similar reporting tools.
  • OSHA 30 certification.

Pay

  • The salary range for this position is dependent upon experience, education, and qualifications.
  • The salary range for this position is dependent upon experience, education, and qualifications.
  • The salary range for this position is dependent upon experience, education, and qualifications.
  • $100,000
  • $100,000 USD

Location

Kentucky, United States

Easy Apply