Team Member - Civil Projects
JSW (My JSW)
- Paradeep, Paradeep, Odisha, India
- Posted
This job is closed: the employer no longer lists it.
- Job Description — Site Quality Monitoring Team Member (Civil)
- Head- Monitoring team
Responsibilities
- Monitoring Engineer
- The Site Monitoring Team Member is responsible for auditing quality control of all civil works at the project sites. The role ensures that construction activities — like concreting, reinforcement, formwork and finishing conform to approved drawings, applicable IS codes, project specifications and the approved Quality Assurance Plan (QAP). The person independently monitors workmanship, witnesses tests, maintains quality reports, and drives non-conformance closure with JSW civil team.
Site Quality Check Points
- Pre-pour checklists (line, level, cover, reinforcement spacing/lapping, embedments, formwork tightness and de-shuttering time)
- Inspection & Test Plans (ITPs) with Hold and Witness points
- Key Roles & Responsibilities (Quality Monitoring)
- Records & documentation
- Verify lab equipment calibration status, testing competence, test methods and record integrity at site and RMC labs.
- Trend analysis & systemic reporting
- Analyse audit findings for repeat issues, root causes and weak contractors/work fronts; report trends and risk areas directly to the Quality Head with data.
- Independent quality reporting
- Issue periodic audit reports and quality-status dashboards through a reporting line independent of site execution, so that schedule pressure does not dilute quality findings.
- Training
Requirements
- 8–10 years (minimum) in RCC constructions preferably on industrial/heavy infrastructure projects and also have experience of working on quality control preferably in steel plant or large scale-industrial construction
- B.E./B.Tech in Civil Engineering
- The candidate must have working command of the following:
RMC & Concrete Quality
- Verification of RMC plant calibration, batching tolerances, mix design approval etc.,
- Checking workability (slump/flow), temperature, retempering control, placement timing and travel time
- Cube sampling frequency, casting, curing, testing and acceptance criteria as per IS 456
Material Testing Knowledge
- Field and lab test interpretation; ability to read mill certificates and third-party test reports
- Familiarity with NDT methods and core sampling for in-situ assessment
- Surveying/level verification, finishing tolerances and surface quality checks
- Earthwork, sub-grade/sub-base, PCC, waterproofing and backfilling quality control
- Examine pour cards, checklists, test registers, NCR logs and material traceability for authenticity, completeness, correct dating and absence of back-dating or post-facto entries.
- RMC plant audit
- Audit RMC plant calibration validity, batching records, mix-design adherence, moisture correction and load traceability, independent of contractor declarations.
- Site laboratory & calibration check
- Periodical training of JSW site engineers and new GETs on various topics of site quality and quality observations at site.
Industry
Industrial Construction — Steel Plant Projects
Location
Project Site (plant premises like Dolvi, Paradeep, Sambalpur, Vijayanagar and other locations) He shall be posted where JSW projects exist or may come
Cement (fineness, setting time, soundness, compressive strength), aggregates (gradation, silt content, impact/abrasion, water absorption), rebar (tensile, bend/rebend, mass per metre), water quality, and soil/fill compaction (Proctor, FDD)
Material testing surveillance
— Independently verify that the actual sampling and testing frequency (cubes, aggregates, cement, rebar, soil compaction) meets the required frequency per IS codes and the QAP, and reconcile test counts against quantities of work executed.
Independent witness on a sampling basis
— Randomly witness selected concrete pours, cube sampling, and field/lab tests to validate that declared results reflect reality; conduct independent cross-checks (e.g., NDT, core sampling, cover meter) where doubt exists.
