Offshore Installation Manager-Floating Production Storage & Offloading Facility
- Shipboard
- On-site
- Mid Level
- 2+ years
- Master's degree
- Posted
Skills
Required
- OIM
- HND
- offshore FPSO operations
Vessel Information
Responsibilities
- Floating Production Storage & Offloading Facility
- 1988
- undefined
Requirements
- Proven experience and results-oriented career AND/OR HND or Degree equivalents in appropriate engineering subject, OR Marine qualified to Master Mariner / Chief Engineer unlimited as per STCW Reg.
- A minimum of 2 years’ experience as OIM.
- Proficiency in English at a minimum of C1 level according to the CEFR international standard.
- Offshore Personal Survival, Management of Major Emergencies, OIM Controlling Emergencies, OIM
- Persons in Charge – MOU Operations Courses - IMO Resolution 1079 section 6.2 or STCW CoC Holder.
- Medically fit according to the Company GEMS ‘Health Requirements to Work Offshore’ Instruction.
- Extensive knowledge of offshore FPSO operations, including Production, Maintenance, Engineering and Safety Management.
- High level of commercial awareness.
Gross Tonnage
144072
Dead Weight
236831
