AI Datacenter Construction Cost Lead
- Columbus, United States
- Lead/Staff
- 8+ years
- Bachelor's degree
- Posted
Skills
Required
- GMP
- switchgear
- generators
- UPS
- chillers
- AIA
- lump-sum
- cost-plus models
Preferred
- Cost Planning & Control
- leveling
We are seeking an AI Datacenter Construction Cost Lead to own cost management and construction procurement across Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will set budgets, run competitive bids, manage contracts and change orders, and secure long-lead equipment so each project is delivered on budget and on time.
You will be the commercial backbone of the construction team, working with site construction managers, the TPM, design, finance, and supply chain. The ideal candidate brings hands-on data center cost engineering and procurement experience and a strong command of construction contracts.
About Bitdeer Technologies Group
About Bitdeer
Bitdeer is a world-leading technology company for Bitcoin mining and AI cloud.
Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Apart from designing industry-leading ASIC chips and manufacturing mining rigs, the Group handles complex processes involved in computing across the value chain. This includes equipment procurement, transport logistics, datacenter design and construction, equipment management, and network and facility operations. Bitdeer also offers advanced cloud capabilities to customers with a high demand for artificial intelligence.
Headquartered in Singapore, Bitdeer operates globally with a diversified 3 GW energy portfolio, and deploys Bitcoin mining and HPC datacenters in the United States, Bhutan, Norway, Canada, Malaysia, and Ethiopia.
A culture that values authenticity and diverse perspectives.
An inclusive, respectful environment with open workspaces and an energetic, start-up spirit.
The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
Responsibilities
Cost Planning & Control
- Develop conceptual and detailed estimates, cost plans, and control budgets for each build.
- Track committed, incurred, and forecast costs, and own Estimate at Completion (EAC) and cash-flow forecasts.
- Review, negotiate, and track change orders, contingency, and allowances with clear documentation.
Procurement & Contracting
- Lead RFPs, bid leveling, and contractor and vendor selection for general contractor, trade, and equipment packages.
- Prepare and administer construction and supply contracts, GMPs, and purchase orders with legal and finance.
- Review contractor pay applications, lien waivers, and retention for accuracy and compliance.
- Manage commercial claims and support their resolution.
- Lead value engineering and benchmarking to lower cost per MW without compromising quality or schedule.
Supplier & Market Strategy
- Build a qualified base of contractors, trade partners, and equipment suppliers across US markets.
- Track pricing, lead times, and labor market conditions to inform budgets and procurement strategy.
- Build a cost database and benchmarks from completed projects.
- How you will stand out
- Builds accurate, auditable cost data.
Requirements
- Candidates will work on site as needed and should be based in one of the following areas, primarily in Texas and Ohio: Austin, TX; Rockdale, TX; Abilene, TX; Houston, TX; Dallas, TX; Massillon, OH; Clarington, OH; Columbus, OH; Akron, OH; or Pittsburgh, PA.
- Secure long-lead equipment (e.g., transformers, switchgear, generators, UPS, chillers, CDUs) and manage OFCI scope, delivery, and payment milestones.
Commercial Management
- 8+ years in construction cost management, quantity surveying, or procurement, with significant data center or mission-critical experience.
- Strong knowledge of construction contract forms (e.g., AIA, ConsensusDocs) and GMP, lump-sum, and cost-plus models.
- Experience procuring MEP trade packages and long-lead electrical and mechanical equipment.
- Proficiency with estimating and cost control tools and advanced Excel.
- Bachelor’s degree in Quantity Surveying, Construction Management, Engineering, or a related field, or equivalent experience.
- Professional certifications such as RICS, AACE (CCP or CEP), or CPSM.
- Owner-side cost or procurement role at a hyperscaler, colocation provider, or AI infrastructure developer.
- Protects the company’s position while keeping contractor relationships productive.
- Involvement in new projects and in developing processes/systems.
Benefits
- A fast-growing company with opportunities to network with industry pioneers and enthusiasts.
- Personal accountability, autonomy, rapid growth, and learning opportunities.
- Attractive benefits and development such as training and mentoring.
Negotiation
Confident, well-prepared negotiator.
Integrity
Runs fair and transparent procurement processes.
What you will experience working with us
Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.
jobapplier