jobapplier

Senior Mechanical Commissioning Project Engineer-Data Center Construction

FST Technical Services

We’re excited to connect with candidates in Chicago; however, this role is based in Atlanta, GA or Detroit, MI. The position offers opportunities for travel and relocation, and we’re seeking candidates who are open to this flexibility. Please note that the role is not based in Chicago. Monthly per diem and mobilization is on offer.

Our Commissioning division partners with clients across data centers and mission-critical environments to validate that systems are designed, installed, and performing at the highest level. We are seeking a Senior Mechanical Project Engineer who brings deep technical expertise, field leadership, and the ability to drive outcomes in high-performance environments.

About FST Technical Services

  • We also welcome applications from candidates interested in future opportunities in other locations across additional states as our needs evolve.
  • Lead the Systems That Keep Critical Infrastructure Running At FST Technical Services, we ensure the most complex facilities operate exactly as intended.

Responsibilities

  • You will Do Project Leadership & Execution • Lead commissioning activities across the full lifecycle • Execute functional testing, witness testing, and system validation • Manage assignments within schedule, budget, and quality expectations Technical Expertise & Problem Solving • Evaluate HVAC, chillers, boilers, pumps, and automation systems • Troubleshoot system performance issues • Review design documentation Client Engagement • Lead meetings and communicate findings • Build relationships with clients and contractors Operational Contributions • Complete reports and manage time and expenses Team Development • Mentor junior engineers and support training What You Bring Core Qualifications • Degree in HVACR, Mechanical, Electrical Engineering or related field • 7+ years experience or 3+ years commissioning • Data center experience required Technical Capabilities • Experience with HVAC, controls, automation, fire safety systems • Ability to read construction documents Professional Skills • Strong communication and problem-solving skills Physical Requirements • Ability to work in field environments and lift 30 lbs Preferred • EIT, CEM, OSHA 30, BIM experience Travel Requirements Travel to project sites as needed based on project demands.
  • Why FST At FST, we value execution, accountability, and expertise.

Benefits

  • Engineers have opportunities to gain experience into leadership roles and work on complex, high-impact projects.
  • $150,000 to $170,000 depending on experience, comprehensive benefits, monthly per diem and mobilization support Long-term opportunity within FST’s growing commissioning organization Important: This position is not remote or rotational from home.

Why This Role

Stands Out This is not a documentation-driven role. This is a position for someone who: Owns system performance from design through execution Understands how complex mechanical systems operate as a whole Can identify and solve issues before they impact operations You will work on large-scale, mission-critical data center projects where performance, reliability, and precision are non-negotiable.

Compensation & Travel Package Base Salary

The successful candidate must be willing to mobilize to the project site and remain site-dedicated for the duration of the project assignment. No visa sponsorship available. Candidates must be authorized to work in the United States.